Model NO.: LJ-6W
Application Fields: Chemical
Certification: ISO, CE
Condition: New
Cooling Capacity @-20degree: 6kw
Inlet and Outlet Connection Size: Dn32 Pn10
Cold Storage Tank: 200L
Expansion Tank: 100L
Compressor: Dorin Semi-Closed Compressor
Piping Material: SUS304
Weight: 800kg
Water-Cooled&Nbsp;Type&Nbsp;W: 6.5m3/H
Trademark: LNEYA
Specification: 160*100*165cm
Origin: Wuxi
HS Code: 8418692090
Industrial One Compressor Refrigeration Equipment Water Cooled Air Chiller
Product Parameter
Model LJ-6W
Temperature range -45ºC~-10ºC
Cooling capacity@-20ºC 12kw
10320Kcal/h
Cooling capacity@-40ºC 6kw
5160Kcal/h
Circulation pump 6.6m³/h 2.5bar max
Inlet&outlet connection size   DN32 PN10
Water-cooled type W 
(cooling water@30ºC)
6.5m³/h
Cold storage tank (optional) 200L
Expansion tank(standard) 100L
Compressor Dorin semi-closed compressor
Operation Panel 7-inch color touch screen display, temperature curve record, 
data export to excel format
Control system Standard: Single-chip microcomputer controller;Stepping 
control; Set temperature difference of refrigeaaration on&off.
Optional:SIEMENS S7-200PLC & Module.
Closed circulation system The whole system is full closed circulation, there is no oil mist a
t high temperature and no water vapor at low temperature, 
pressure do not rise up when system is running. The system 
will supplemrnt oil automaically at low temperature.
Circulation pump Standard: Direct type magnetic pump Optional:Increase the 
pipeline magnetic pump at low temperature.
Evaporator Standard:Braze welding plate heat exchager(BPHE) Optional:
Stainless steel tube heat exchanger
Condenser Shell and tube type water cooled condenser
Intermadiate Heat exchanger KAORI Plate heat exchanger
Dry filter Emerson
Drying filter core Emerson
Expansion valve Emerson
FDF Emerson
Oil separator Emerson
Pressure protector Emerson
Reservior Standard:RSP Optional:Danfoss
Sight glass Standard:SANHUA Optional:Danfoss
Refrigeration ball valve Standard:SANHUA Optional:Danfoss
Electric Schneider AC contactor, Schneidr intermediate relay
Refrigerant R404A
Seconary refrigerant No corrosive liquid, ethanol water, ethylene glycol aqueous 
solution, heat transfer oil etc.
Safety protection High pressure protect;Water supply cut-off protection; over-current protection; Leakage protection: Sequential and phase 
failure protection;High temperature protection; Sensor failure p
rotection;liquid low level protection;Liquid low level protection 
etc.muti-safety protection.
Level Indicator Adpot glass liquid level indication
Piping material SUS304
Expansion tank material SUS304
Case material Steel channel+ Square tube + Cold-rolled blanking plate 
painting
Product size(cm) 160*100*165
Power 380V 50HZ 10KW max
db Within 75db
Weight 800kg
Optional Optional outside touch screen display controller(separated), 
the communication line distance is 10 meter
optional optional explosion-proof touch screen control system(ExdellBT4), 
the communication line distance is 15 meter

Technological Process
Industrial One Compressor Refrigeration Equipment Water Cooled Air Chiller
Company Profile
Industrial One Compressor Refrigeration Equipment Water Cooled Air Chiller

Wuxi Guanya Refrigeration Technology Co., Ltd. Specialized in rerfigeration equipment, ultra-low temperature freezer, cooling and heating temperature control system, heating circulation system, explosion-proof electric equipment. Automatic integrated disparate control system, laboratory apparatus. We are the technology leader for high precision thermoregulation solutions in Research and Development Industry. Our products ensure precise temperature control throughout the whole world in laboratories, pilot plants and production processes. Our product range offers temperature control solutions for applications from -152 to +350ºC.

We make market and user need oriented products, focusing on science and technology applying international advanced technology, endlessly get rid of the stale and bring forward the fresh following the market step & meet market demand. The company always insists on standardised management in accordance with ISO9001-2008 international quality certification requirement from product design, purchase and selection of components, to production process flow, packaging and transportation etc, try to keep improving products, and keep reasonable price and satisfactory service.

Service Scope: Steam Turbine spare parts supply; steam turbine installation, inspection & overhaul, technological upgrading, turbine technology training, turbine low oil pressure renovation, turbine rotor shaft bend restoration, lower turbine`s vibration and noise, remove speed governing system abnormal volatility or load swing, solve turbine insufficient output, discontent load or other common/exceptional faults.


  Contract to overhaul and all kinds of turbine`s remould, turbine dynamic balance and so on, for satisfying practical operation requirements.


   Provide technical support and service for operation, inspection, maintenance, accident treatment and so on.


1. Steam Turbine Maintenance/Overhaul Service

 

   Steam turbine normal overhaul, failure treatment; main body components repair, heat exchange tubes of cooler replacement and so on.


2. Technical guidance


   Generating or Industrial driving turbine inspection, overhaul, upgrading and other items technical guidance.


3. Thermodynamic System Optimizing Services


   For operating or planning projects or equipment, according to end users` actual CHP(or heat-work cooling) requirements, make cycle efficiency analysis, provide system optimizing service.


4. Speed Governing System Remould

 

   Upgrade old hydraulic governing system to digital electro-hydraulic governing system, satisfy flexi-ble configuration all kinds of control strategy requirement.


5. Flow Passage Optimization and Modification


Total modification for steam turbine shall increase old turbine`s economic efficiency with advanced technology, service life also shall be extension.


6. Turbine Parameters Remold and Modification


Apply to processing or procedure transformation (or project site change) cause turbine operation parameters` change.


7. Uncontrolled extraction steam reconstruction


Consideration of turbine security and economic, open a hole for extraction steam normally in order to heat supply reformation.


8. Steam Turbine Engineering Service


Provide small & middle size Steam Turbine Generator or industrial steam turbine complete set engineering, project design and project installation service.


9. Vibration Analysis and Rotor Dynamic Balance

24Hours Service for emergency vibration analysis and wide range rotor dynamic balance service at project site or back to factory.


10. Condensing (extraction condensing) type remodel to back pressure type


Condensing (extraction condensing) steam turbine remodel to back pressure steam turbine


11. Steam Turbine Vacuum System Upgrade


Condenser three-dimension design and upgrade, reduce heat-transfer temperature difference, increase steam exhaust vacuum degree, improve turbine economic efficiency. Water cooling remodel to air cooling.


12. Steam Turbine Enlargement Capacity Reconstruction


Reconstruct the turbine`s capacity which are caused by system or equipment changing.


13. Motor Speed Governing Variable-frequency Remould

 

 Variable-frequency drive remould for pump systems of all kinds of industrial and mining enterprises.


14. Domestic Equipment Reconstruction


Domestic equipment reconstruction for imported turbine


15. Circulating Cooling Water System Optimization and Modification


Optimization and modification of operating circulating cooling water system, reduce operation energy consumption rate.


16. Waste Heat Steam Turbine Gland Seal System Upgrade


After upgrade, steam leakage ( effect gear box oil quality) shall be improved by the reason of waste heat parameters are not stable.


17. Spare Parts Marketing


Normal easily damaged parts warehouse, shorten delivery time.

Case 1


   A fertilizer company has 2 sets of steam turbine, model are: CB6-3.43/1.27/0.294 and CB6-3.43/1.17/0.294. Because end user`s power load and steam consumption are changed, the turbines must be reconstructed according to steam parameters, flow change and guarantee high efficiency.


   Remould Parameters: turbine max. inlet steam is 100t/h, when inlet steam is 97t/h and inlet pressure is 3.15MPa(g), its extraction steam is 62t/h extraction pressure is 1.51MPa(g), exhaust pressure is 0.21MPa(g), guarantee output is 5800KW (deviation±5% ).


   Main job of remould and overhaul:


   1. Casing was sent back to manufacture`s factory for rebuilding 2 valve seat hole, expand nozzle block steam passage.


   2. Change nozzle block, take out guide blade carrier.


   3. The original double row governing stage impeller and blade was changed to single row governing stage impeller and blade, add governing stage sheath, parts of rotor sleeve need to be changed and adjusted.


   4. LP stage 3rd diaphragm steam passage inspection optimization.


   5. Casing and rotor dismounting and assembling in factory with comprehensive inspection.


   6. Rotor low speed dynamic balance test.


   7. Governor static test in factory, overspeed test.


   8. Dismount & assembly, overhaul at project site.


   9. Clear incrustation for steam governing valve, nozzle and blade.


   10. Gland seal inspection and replacement, gland sealing clearance adjustment, change the seal block which was severe wear, spring leaf which are damaged should be changed.


   11. Every bearing repair and adjust.


   12. HP & LP governing steam valve grinding, stroke adjustment.


   13. Front bearing pedestal dismounting and inspection, patch oil leaking points.


   14. Inspection and patching steam leaking of HP steam governing valve link rod.


   15. Turbine mainbody troubleshooting.

   After remolding is complete, the 2 turbine sets are running very well.


Case 2

There is a paper mill which has a set of steam turbine: B6-3.43/0.981. Due to processing consumption in workshop and load were changed, the end user request reset new back pressure and achieve the best efficiency within the shortest time.


   Parameters reform to: when rated inlet flow: 55t/h, inlet pressure: 3.43±0.2MPa(a), exhaust pressure: 0.59MPa(a), steam rate guarantee value must be 11.65kg/(kw·h), output power must be 4700KW under rated working condition. The reconstruction project is a turnkey project, from preparing components to dismount heat material, equipment dismounting and installation, till to equipment commissioning successfully.


   For reducing the work amount, keep casing and pipelines still, main jobs are following:


   1. Change front & rear gland seal and diaphragm seal.


   2. Change main shaft assembling (keep mail oil pump and coupling still).


   3. Change HP nozzle block, HP guide blade carrier and original 2 stage diaphragm, add 3 stage diaphragm, 5 stage diaphragm adopts special design for satisfy the requirement.


   4. Change the original 3 stage impeller and add another 3 stage impeller.


   5. Steam governing valve link rod adjust inlet steam, check all butterfly valves matching conditions, improper ones should be changed.


   6. Original rotor`s coupling, MOP shall be mounted in new rotor.


   7. Rotor balance.


   8. Change sylphon of governing system.


   9. Change pressure transducer sleeve, adjust hydraulic servo-motor stroke.


   10. Governor static test in factory.


   11. Clear oil system.


  The reconstructed steam turbine is B4.7-3.43/0.59, end user evaluates steam rate, vibration, exhaust temperature very strictly, but the reconstructed steam turbine is running very well and fully meet the design performance.



Steam Turbine Care

Steam Turbine Care,Steam Turbine Services

Shandong Qingneng Power Co., Ltd. , https://www.steamturbine.be

Posted on