Model NO.: SH-RS
Material of Roller: Gcr15, Precision-Machined, High Frequency Quenchin
Main Motor Power: 7.5kw
Control System: PLC with Touch Screen
Hydraulic Station Power: 4kw
Trademark: Suhang
Transport Package: Standard Package with Film, Plastic and Steel Wire
Specification: 7.5mx0.8mx0.8m
Origin: Wuxi, Jiangsu
HS Code: 8455229090
Model NO.: SH-RS
Material of Roller: Gcr15, Precision-Machined, High Frequency Quenchin
Main Motor Power: 7.5kw
Control System: PLC with Touch Screen
Hydraulic Station Power: 4kw
Trademark: Suhang
Transport Package: Standard Package with Film, Plastic and Steel Wire
Specification: 7.5mx0.8mx0.8m
Origin: Wuxi, Jiangsu
HS Code: 8455229090
                               Warehouse racking shelf roll forming machine

Technical Parameter
1. Suitable raw material: 0.7-1.2mm galvanized coil S235JR
2. Material width:200-600mm
3. Forming stations: 18 stations
4. Material of Roller: Gcr15, precision-machined, high frequency quenching HRC58-62, diameter of rollers: >150
5. Material of Main Shaft: 45# high quality steel (diameter>50)
6. Driven system: Chain Driven 1.5 inches 
7. Chains' material: 45# steel, high frequency quenching, circular pitch: 38.1; number of teeth: 13
8. Cutting: Hydraulic Cutting Cr12mov
9. Material of Cutting Knife: Cr12Mov, Quench HRC58-62
10. Hydraulic Station Power: 4KW 
11. Control system:PLC Panasonic with touch screen
12. Encoder:Omron
13. Electric parts:Schnneider
14: Tolerance:6m+-1.5mm
 
Main Components
De-coiler 1 set
Leveling device  1 set
Roll forming machine  1 set
Punching device 2 sets
Hydraulic cutting and bending device 1 set
Hydraulic station 1 set
PLC control box 1 set
Safety cover 1 set
Ran out table 2 sets
Control panel 1 set
 
Working Flow of Roll Forming Machine
 
Uncoiling-Feeding&Leveling-Punching--Roll forming-Cutting&Bending-Products collecting
 
A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)

B.Hydraulic Punching...........................................To punch as requirements

C.Roll Forming Unit.........................................................To roll form as requirements

D.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)

E.Output Table................................................................Support the finished products

Machine picture
Steel Storage Rack Shelf Roll Forming Machines with Bending

After-sale Serive
 
    - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
   - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
   - Training time: 5 days.
   - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
   -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

FAQ
 
1). Does one machine can only produce one style panel profile?
Not exactly.For wider and double layer making machine. It can produce more than 6 kinds of panels.
Besides, the width is adjustable.
 
2). Do you have after sales support?
Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
 
3). How to visit your company?
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Wuxi Station (30 minutes), then we can pick up you.
 
4). What can you do if the machine broken?
Our machines' warranty period is 12 months, if the broken parts can't repair, we will send the new parts replace the broken parts for free, but you need pay the express cost  If after warranty period, we can through negotiation to solve the problems, and we supply the technical support for the whole life of the machine.
 
5). Can you be responsible for transport?
Yes, please tell me the destination port or address. we have rich experience in transportation.
 
6). You are trade company or factory?
We are factories.
 
7). Why your price is higher than others?
As we persist on that factory should put quality at the first place. We spend time and money on developing how to make machines much more automatic, accurate and high quality. We can make sure that our machine could use more than 20 years without any problem. 
 
8). How long the machine could be made?
Normally speaking, deck floor roll forming machine could be made about 60 working days. If you need machines in a hurry, we can try it short time.
                                 Warehouse racking shelf roll forming machine

Technical Parameter
1. Suitable raw material: 0.7-1.2mm galvanized coil S235JR
2. Material width:200-600mm
3. Forming stations: 18 stations
4. Material of Roller: Gcr15, precision-machined, high frequency quenching HRC58-62, diameter of rollers: >150
5. Material of Main Shaft: 45# high quality steel (diameter>50)
6. Driven system: Chain Driven 1.5 inches 
7. Chains' material: 45# steel, high frequency quenching, circular pitch: 38.1; number of teeth: 13
8. Cutting: Hydraulic Cutting Cr12mov
9. Material of Cutting Knife: Cr12Mov, Quench HRC58-62
10. Hydraulic Station Power: 4KW 
11. Control system:PLC Panasonic with touch screen
12. Encoder:Omron
13. Electric parts:Schnneider
14: Tolerance:6m+-1.5mm
 
Main Components
De-coiler 1 set
Leveling device  1 set
Roll forming machine  1 set
Punching device 2 sets
Hydraulic cutting and bending device 1 set
Hydraulic station 1 set
PLC control box 1 set
Safety cover 1 set
Ran out table 2 sets
Control panel 1 set
 
Working Flow of Roll Forming Machine
 
Uncoiling-Feeding&Leveling-Punching--Roll forming-Cutting&Bending-Products collecting
 
A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)

B.Hydraulic Punching...........................................To punch as requirements

C.Roll Forming Unit.........................................................To roll form as requirements

D.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)

E.Output Table................................................................Support the finished products

Machine picture
Steel Storage Rack Shelf Roll Forming Machines with Bending

After-sale Serive
 
    - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
   - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
   - Training time: 5 days.
   - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
   -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

FAQ
 
1). Does one machine can only produce one style panel profile?
Not exactly.For wider and double layer making machine. It can produce more than 6 kinds of panels.
Besides, the width is adjustable.
 
2). Do you have after sales support?
Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
 
3). How to visit your company?
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Wuxi Station (30 minutes), then we can pick up you.
 
4). What can you do if the machine broken?
Our machines' warranty period is 12 months, if the broken parts can't repair, we will send the new parts replace the broken parts for free, but you need pay the express cost  If after warranty period, we can through negotiation to solve the problems, and we supply the technical support for the whole life of the machine.
 
5). Can you be responsible for transport?
Yes, please tell me the destination port or address. we have rich experience in transportation.
 
6). You are trade company or factory?
We are factories.
 
7). Why your price is higher than others?
As we persist on that factory should put quality at the first place. We spend time and money on developing how to make machines much more automatic, accurate and high quality. We can make sure that our machine could use more than 20 years without any problem. 
 
8). How long the machine could be made?
Normally speaking, deck floor roll forming machine could be made about 60 working days. If you need machines in a hurry, we can try it short time.
 

 In strict accordance with ISO 9001:20015 and Jis Flanges;
    1.Make process card and quality plan
    2.Choose the qualified raw material and do incoming test, not allowed      
     nonconforming material to enter into production process;
    3.Producing and testing followed the quality documents 
    4.Be good at Quality records and product identification to ensure the product 
    traceability
    5.Do the final inspection to ensure 100% of pass.


JIS Flanges

Jis Flanges,10K Flange Jis,Jis Flange B2220,Jis Flange 5K Soh

Shanxi Tianbao Group Co.,Ltd. , https://www.tbflange.com

Posted on